Main phases of repair in the apartment or condo

Main stages of repair in the apartment.

How to start repair works of the apartment?

The very first stage of the repair work of old homes is the damage and dismantling to start with of the worn out walls and partition walls, eliminating the wall and ceiling coating. This phase is among the most "dirty" phases of the repair work.

One more among the most essential and "dusty" works is the window block replacement. It is necessary to do this first off because dirt and dust will be unallowable throughout following phases and it is forbidden at all to open windows during painting and wallpaper works (large drops of the temperature level and moisture are unallowable). After installing windows and windowsills it is necessary to pack them right away in polyethylene movie and to cover windowsills in addition by the fiber board (in order to prevent scratches).

The following stage is electrical wiring. Wiring can be set up in walls or along the flooring. Circuitry is made inside the pipes to ensure electrical safety and boost dependability. The pipe safeguards wiring from external damages and enables to replace the wire completely without breaking walls and flooring simply by inserting the new wire instead of the old one.

House Painting follows the wiring. The frequent error throughout the synchronised conducting of such works occurs when employees forget to set out one of the cable televisions and home painters have already plastered and smoothed out the wall. As a result, additional works are required to seal chases on the ended up wall. The places of the feed switch and wall outlet place and their number should be thought-out beforehand. The plan of power wiring is usually included into the design project.

Later on the system need to be all set to service in case of failures. In addition to the wirings, the telephone cable television and the TV cable are laid out. The power cable must not be set out near the telephone and antenna cable televisions to prevent sound pickup and get leak detection disturbance. The most strange moment is setting out the television cable television. In order to make two (or 3) television set in the house the second cable television is often just "securely soldered" in parallel, so the cable resistance is lowered. As a result, the screen quality is deteriorated, numerous programs can't be gotten and etc. In order to avoid such situation it is necessary to invite a professional with special devices. He will measure the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.

Painting is the most long-term process, that is why it is carried out all at once in all properties, if it is possible. Hold-ups are related to the innovation. Each applied layer of the plaster (or filling out ending up) must dry entirely before the work will continue.

Works in hygienic plans and the kitchen start at the same time with house painting. It is better to fulfill so-called "dirty" works in the top place and concurrently. In accordance with the plan of the hygienic technician place welding, wall chasing and pipe run are performed. Steam radiator admissions are prepared, taps and brackets are installed, however radiators are not installed.

Then operates in hygienic arrangements are carried out according to the plan. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The list below stage is assembling ceiling and laying tiles on the floor. And at last other sanitary gadgets, mixers and devices are mounted.

image

After circuitry, setup of rosette plates and terminal boxes the voltage is signed in all point. Ends of circuitry are insulated and set out into rosette plates. Sockets and breakers are not installed during this phase in order to conserve their surface area look. The finish puttying of walls is conducted all at once. The highly specific control of drying of the layer of the plaster (filling) is carried out by drymeter. It is an unique instrument that Additional hints determines moisture of the material.

The following phase is the procedure of fill. Fill can be made with various materials-- from typical masonry cement-sand mix to self-aligning floorings. The benefit of the simple mix is its cheapness, the drawback is that such mix is much harder aligned at the level and the last dry time of such fill is 40 days, just then the next phase of the deal with floor can be conducted, i.e. the duration is too long. Self-leveling self-aligning floorings are far more expensive, however more technological. Lining up takes place almost "automatically" i.e. fluid option of mix is poured out, then it runs and you receive the horizontal surface area. The final dry time is 15 days i.e. you have significant time economy. The system "warm flooring" is set up into the fill. If the so-called "damp procedures" are inapplicable the innovation of the dry lining up (the fill innovation) is utilized bases for floors with adjustable floor battens are mounted.

After fill door boxes and door are set up. Installation of doors should take into the account thickness of future flooring covering. After installation the door can be removed its hinges and removed until the end of repair or loaded into polyethylene film to secure from damages. Simultaneously ceiling can be painted and the tile can be laid in that facilities where it was prepared. The tile needs to be laid on the definitely dry overlay.

Finishing of the flooring installing depends upon the planned covering. In many cases (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the floor by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to provide the close fixing of plywood and long-lasting service of the flooring without squeak and bulging. The plywood provides the extra heat- and acoustic insulation. After installing of the plywood is ended up, wallpaper for painting can be pasted on walls.

In facilities where finish covering of the flooring is laminated floor covering or parquet hoard, the regular wallpapers are pasted (not for painting) in the very first location. Then the floor covering is mounted.

If surface covering of the flooring is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the ordinary wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending on the quality of the parquet and lacquer). The discussed repercussion is linked only with such rushing process when the terrific quantity of dust is created. In spite of the fact that great floor mills are geared up with the vacuum cleaner, the enough amount of dust is precipitated on surrounding subjects consisting of walls. Dust is really acerbic and is badly cleaned off. That is why in order not to damage wallpapers, they are pasted after rushing and in order the parquet do not take in the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.

After this the primary works can be considered to be finished. It is left only to install the plinths, ornamental elements, breakers and sockets, curtain holders, to hang doors, plant-bands and others.

In conclusion it is essential to keep in mind that the series of works was listed in basic and can alter depending upon the definite scenario-- the variety of rooms in premise, your resources, peculiarities of the building and construction of the multilevel facilities. It is based upon good sense and everyone capable of analysis can separately create such a series.